[1]
Kaborogo, F.S. , Kiswaka, E.B. and Lazaro, M.B. 2024. Cost Estimation Proxy Models for Economic Evaluations in Petroleum Projects: A Case Study from the Onshore Gas Field in the Southern Coastal Tanzania Basin . Tanzania Journal of Engineering and Technology. 42, 4 (Feb. 2024), 56-68. DOI:https://doi.org/10.52339/tjet.v42i4.867.