Assessment of the Performance of Grinding Circuit for Buzwagi Gold Mine
DOI:
https://doi.org/10.52339/tjet.v39i2.702Keywords:
Comminution, Grinding circuit, SAG mill, Ball mill, Circuit survey, Bond work index, Bond efficiency factor, Gold ore blendsDownloads
Download data is not yet available.
Downloads
Published
2020-12-31
How to Cite
Wikedzi, A. (2020). Assessment of the Performance of Grinding Circuit for Buzwagi Gold Mine. Tanzania Journal of Engineering and Technology, 39(2), 144-164. https://doi.org/10.52339/tjet.v39i2.702
Issue
Section
Article