Co-generation system, Gas turbine control system, System efficiency, Heat balance

Abstract

The power utility, Tanzania Electric Supply Company Limited (TANESCO) is faced with challenges of supplying adequate power to the ever-increasing demand. To this end, this paper explores the installed Ubungo Gas Power Plant (UGP II) located in Dar es Salaam to find means of utilizing it in co-generation method. The study embarked on detailed modelling of the system and run simulations which indicated that the co-generation can result to power generation efficiency increase between 10.42 to 50.92%. It is recommended to change the UGP II to exploit this co-generation method. Further, the study could be improved by including more parameters of the gas and steam plant and verify them experimentally. 

Downloads

Download data is not yet available.

Author Biographies

Elias E. Nyanda, Tanzania Electric Supply Company

Ubungo II Gas Power Plant

Aviti T. Mushi, University of Dar es Salaam

Department of Electrical Engineering

Jackson J. Justo, University of Dar es Salaam

Department of Electrical Engineering

Downloads

Published

2022-08-05

How to Cite

Nyanda, E., Mushi, A., & Justo, J. (2022). Viability Analysis of Ubungo II Gas Power Plant Efficiency Improvement Using Co-generation System. Tanzania Journal of Engineering and Technology, 41(2), 158-170. https://doi.org/10.52339/tjet.v41i2.789
Abstract viewed = 271 times

Most read articles by the same author(s)